A flat, draining court with a UV-stable surface you can play on year-round, sized to your yard.
On-Site Evaluation
Itemised Estimate
Full & Half Courts
Final Walkthrough
What Goes Wrong
Where rushed installs fail, and what a correct build does differently
Poor Drainage Slope
A slab poured without a graded drainage slope traps standing water after every Central Florida thunderstorm, softening the base over time.
Graded Before Pouring
The subgrade is graded to a consistent drainage slope before any concrete is placed, so water sheds off the finished slab.
Weak Subgrade Base
Sandy soil that is not excavated and compacted first will shift under load, causing the slab above it to crack within a season or two.
Compacted Subgrade First
The builder excavates, compacts, and confirms base stability before pouring, so the slab has a firm, uniform foundation beneath it.
No Rebar or Mesh
A plain concrete pour without rebar or wire mesh reinforcement has no tensile strength to resist the cracking that heat cycles and root pressure cause.
Reinforced Slab Pour
Rebar or wire mesh is set through the slab before the pour, giving the concrete the tensile strength to stay intact through Florida’s heat cycles.
UV-Unstable Coating
A surface coating not rated for intense UV exposure fades, peels, and loses grip within one to two Florida summers, leaving a slick, uneven playing surface.
Acrylic Color Coating
A UV-stable acrylic color coating applied in multiple passes holds its grip and color through year-round outdoor use in Central Florida’s climate.
The installation sequence starts with site grading and leveling to establish a consistent drainage slope across the slab footprint. Central Florida’s sandy soil can shift under load if the subgrade is not properly compacted first, so the site is excavated, compacted, and confirmed stable before any concrete is poured.
A concrete slab with rebar or wire mesh reinforcement is the standard base for an outdoor court in this climate. Slab thickness and edge detailing are confirmed during the on-site evaluation. Once the concrete has completed its cure interval, perimeter edging is set and the surface is prepared for coating.
Acrylic color coating is applied in multiple passes to give the finished surface grip, UV stability, and a consistent playing feel. Regulation line markings for the chosen court size are painted after the coating cures. Hoop installation, including anchor sleeve placement, is scoped as part of the same job so post-pour drilling is not needed.
Scope & Options
Court sizes & surface options covered
From a backyard half court to a full commercial facility, the scope is set during the on-site evaluation.
Full Court Installation
A regulation-length concrete slab with rebar reinforcement, acrylic coating, and full-court line markings for competitive play.
Half Court Installation
A compact slab sized for backyard or side-yard spaces, with a single hoop anchor sleeve and standard half-court markings.
Concrete Slab Base
Site grading, subgrade compaction, and a reinforced 4-inch concrete pour form the stable base every outdoor court needs.
Acrylic Surface Coating
Multi-pass UV-stable acrylic coating applied after the cure interval gives the slab grip, color, and a consistent playing surface.
Hoop & Anchor Installation
Anchor sleeve placement is scoped before the pour so no post-cure drilling is needed and the hoop sits at regulation height.
Resurfacing & Repair
Worn or cracked courts can be resurfaced with fresh acrylic coating and restriped without a full slab replacement.
Drainage Planning
Slope and runoff mapped before grading begins.
Regulation Line Marking
Court lines painted to standard dimensions.
Perimeter Edging
Edge detailing set after the cure interval.
Site Measurement
Full-yard assessment before any scope is written.
Why Choose Us
Why Orlando Sports Courts for basketball court installation?
Local conditions, a clear process, and accountability from first visit to final walkthrough.
Evaluation Before Any Scope Is Written
Every job starts with an on-site visit covering drainage, slope, and slab requirements before a single number is quoted.
Itemised Written Estimate
The quote lists base prep, surfacing, and line marking as separate line items so you see exactly what you are paying for.
Central Florida Conditions Built In
Sandy soil, high water tables, and intense UV are accounted for in the drainage plan and coating spec, not treated as afterthoughts.
Backyard to Commercial Scale
The same process covers backyard half courts, HOA facilities, school courts, and commercial properties across the Orlando area.
Final Walkthrough Sign-Off
The job is not closed until a walkthrough confirms the finished court meets the agreed scope and plays correctly.
Resurfacing Available Later
When the surface eventually wears, resurfacing and restriping are possible without replacing the slab underneath.
Questions about basketball court installation in Orlando
What is the most affordable way to build a backyard basketball court?
A half-court on an existing level concrete pad is the lowest-cost starting point, since it cuts both the slab area and the surfacing material roughly in half. Skipping fencing and lighting at first also reduces the initial outlay. Most backyard basketball court projects run $25,000-$50,000, depending on court size, base condition, and surface type chosen.
What can make the final cost go up after prep or slab work starts?
Hidden soil problems are the most common cause, soft, sandy, or poorly compacted ground requires deeper excavation and more base material than a standard quote assumes. Drainage issues found during site prep can also add French drains or regrading work. Tree roots, buried debris, or a yard that is more sloped than it appears on a walkthrough all push costs higher once digging begins.
Do I need a concrete slab for a basketball court?
A solid, stable base is required, and poured concrete is the most common choice because it resists movement and supports the sport surface evenly. Asphalt is a lower-cost alternative that still works well when properly compacted and sealed. Playing on bare soil or grass is not viable, the surface shifts, drains poorly, and causes uneven bounce and injury risk.
How thick should the slab be for a basketball court?
A residential basketball court slab is typically poured at 4 inches thick with a wire mesh or rebar grid inside. Heavier-use courts, such as those on HOA or school sites, often go to 5 or 6 inches for added load tolerance. The correct thickness depends on the soil bearing capacity confirmed during site evaluation.
How much space do I need for the court size I want?
A regulation NBA full court is 94 by 50 feet, but most residential builds use a half-court at 47 by 50 feet or a compact 30 by 30 foot shooting area. Add at least 3 feet of buffer on each side for safe out-of-bounds play. So a usable half-court needs roughly 53 by 56 feet of clear, level space.
Is it better to do this myself or hire a pro?
Concrete work, grading, and sport surface installation require equipment and sequencing that make DIY attempts high-risk. A slab poured at the wrong thickness or without proper drainage slope will crack and pool water. Hiring a crew that specializes in sport courts means the base, surface, and drainage are coordinated from the start, avoiding costly repairs later.
What is included in the job, like prep, slab work, and the surface?
Every job starts with an on-site evaluation of the space and drainage, followed by an itemised written estimate. The scope covers base preparation, slab or asphalt work, sport surface installation, line marking, and optional fencing and lighting. A final walkthrough is completed before the job is signed off to confirm everything meets spec.
Will the court crack or need repairs later?
Cracking is most often caused by an undersized slab, poor sub-base compaction, or tree roots growing beneath the concrete. A correctly poured 4-inch reinforced slab on a stable compacted base resists cracking under normal residential use. If cracks do appear over time, resurfacing and crack repair can restore the court without a full rebuild. See resurfacing options.