Skip to content

Court Builders

Tennis Court Installation in Orlando

A flat, crack-free court that holds up through Florida’s rain and sun, built from the ground up.

  • On-Site Evaluation
  • Written Estimate
  • Full Scope Covered
  • Final Walkthrough
An empty outdoor tennis court with blue and green surfaces at sunrise, surrounded by a fence and trees.

What Goes Wrong

Where rushed court builds fail, and what a proper build does instead

Skipped Base Prep

Clay-mixed soil that is not excavated and compacted shifts under load, causing the slab to crack within a few seasons.

Compacted Stone Base

A crushed stone layer is placed and compacted before any concrete or asphalt is poured, giving the slab a stable foundation.

Drainage Added Late

Drainage components fitted after the slab is poured cannot redirect water properly, leaving standing pools on the playing surface.

Drainage Set at Base Stage

Drainage system components are positioned during subbase work so water moves off the court from day one, not retrofitted later.

Wrong Surface Slope

A surface slope outside the 1-percent tolerance causes water to pool at low spots and creates an uneven playing experience.

Slope Checked Before Surfacing

The builder verifies surface level and drainage direction before acrylic coats are applied, so the finished court sheds water correctly.

Tight Site Footprint

Measuring only the painted playing area and ignoring run-off clearance leaves a court that feels cramped and is unsafe to play on.

Full Footprint Mapped First

The site assessment maps the complete footprint, playing area, run-off clearance, fencing setback, and access, before excavation starts.

Common problems, answered

Scope of Work

What a full tennis court installation covers

Every stage from raw ground to a playable, lined court is arranged under one scope.

Site Grading & Leveling

The ground is cut and filled to achieve a consistent slope that sheds water without creating low spots on the court.

Subbase Preparation

Crushed stone is placed and compacted to a stable depth before any concrete slab or asphalt base layer is poured.

Drainage System Installation

Drainage components are set during base work so surface water moves off the court rather than pooling under the acrylic layer.

Acrylic Sport Surfacing

Multiple coats of UV-resistant acrylic are applied over the cured base to handle Orlando’s year-round sun and heavy seasonal rain.

Net Posts & Perimeter Fencing

Net posts are set in concrete footings at regulation spacing; perimeter fencing and gate placement are completed in the same scope.

Regulation Line Striping

Court lines are measured and painted to regulation accuracy, with a final walkthrough confirming every marking before sign-off.

Court Lighting

Pole-mounted lighting for evening play.

Backyard Courts

Private residential installations on any lot size.

HOA & Community Courts

Multi-court layouts for shared amenity areas.

School & Club Courts

Commercial-grade builds for high-use facilities.

Tennis Court Build

A tennis court that holds its surface through Florida’s seasons

The base and drainage design determine whether a court stays flat and crack-free, the surface coating is only as good as what’s underneath it.

Site assessment covers soil condition, drainage direction, and usable land beyond the painted playing area. A regulation singles court needs more than the 78-by-36-foot playing surface, run-off clearance, fencing setback, and drainage slope all require additional space. Central Florida’s sandy and clay-mixed soils are evaluated at this stage so the base design accounts for local ground conditions before any excavation begins.

Subbase preparation is the most consequential stage of the build. The soil is excavated, a crushed stone base layer is placed and compacted, and drainage system components are set before the concrete slab or asphalt base is poured. Doing this work in sequence means water has a clear path off the court from the moment the surface is finished, not after problems appear.

Acrylic sport surfacing is applied over the cured base in multiple coats, with UV-resistant pigment to handle Orlando’s year-round sun. Net posts are set in concrete footings at regulation spacing. Perimeter fencing, gate placement, and line striping are completed as part of the same scope, with a final walkthrough confirming surface level, drainage flow, and line accuracy before the job is signed off.

Why Choose Us

Why Orlando Sports Courts for tennis court installation?

Local site knowledge, a clear written scope, and accountability from first visit to final walkthrough.

Site Visit Before Any Commitment

Every enquiry starts with an on-site evaluation of soil, drainage, and footprint, no guesswork, no obligation.

Itemised Written Estimate

The quote lists base preparation, surfacing, fencing, lighting, and line marking as separate line items so nothing is hidden.

Central Florida Soil Knowledge

Partners understand how Orlando’s clay-mixed soils and seasonal rainfall affect base design and drainage placement.

One Scope, No Gaps

Grading, base work, surfacing, fencing, and line striping are arranged under a single scope with one point of contact.

Final Walkthrough Included

Surface level, drainage flow, and line accuracy are checked and confirmed before the job is considered complete.

Residential to Commercial Coverage

Backyard courts, HOA facilities, school campuses, and commercial properties are all within the service area.

A completed sports court builder job at a house
A finished sports court builder project

The Process

From first enquiry to a finished, playable court

  1. 01

    Request an Evaluation

    Submit your site details and we arrange a free on-site visit to assess soil, drainage, and the full footprint needed.

  2. 02

    Review Your Written Estimate

    You receive an itemised estimate covering every stage, grading, base, surfacing, fencing, and line marking, before work starts.

  3. 03

    Build, Inspect & Sign Off

    The builder completes each stage in sequence, finishing with a walkthrough that confirms level, drainage, and line accuracy.

Pricing Estimates

Typical Tennis Court Installation Prices

JobTypical costTypical size
Residential tennis court$45,000-$80,0001 court
Community or club court$60,000-$120,0001 court
Premium court with added features$90,000-$150,0001 court
These prices are estimates and often vary with the condition, size and scope of each job. Message or call us for a free, no-obligation quote.
See all prices

Common Questions

Questions about building a tennis court in Orlando

How much does it cost to build a tennis court?

Most tennis court builds in the Orlando area come in at $45,000-$80,000, depending on site conditions, surface type, fencing, and lighting. A flat lot with easy access costs less than a site needing significant grading or drainage work. An on-site evaluation produces an itemised written estimate so you know exactly what each element costs before any work begins.

What is included in a tennis court build?

A full build covers site evaluation, base preparation, surfacing, fencing, lighting, and line marking. Every project starts with an on-site assessment of space and drainage, followed by an itemised written estimate for each element. A final walkthrough is completed before the job is signed off.

Do I have enough land for a tennis court?

A regulation singles court is 78 feet long by 27 feet wide, but the full play area including run-off space needs roughly 120 by 60 feet. Most standard residential lots in the Orlando area can accommodate this if the yard is reasonably open. An on-site evaluation confirms whether your specific space works and flags any grading or drainage issues.

Can a tennis court fit on my property?

It depends on whether you have a clear run of at least 120 by 60 feet after accounting for setbacks and existing structures. Irregular lot shapes, trees, and utility easements all affect placement. An on-site evaluation maps the usable footprint and identifies the best orientation before any commitment is made.

What is the cheapest way to build a tennis court?

A post-tension concrete slab with an acrylic coating is typically the most cost-effective long-term option because it resists cracking and needs minimal upkeep. Asphalt costs less upfront but requires more frequent resurfacing. Cutting corners on base preparation is where courts fail early, so the base is not the place to reduce the budget.

Should I build a tennis court myself or hire a pro?

DIY tennis court construction almost always leads to base failures, drainage problems, and uneven surfaces that cost more to fix than the original build. Proper sub-base compaction, slope tolerances of 1 percent or less, and acrylic surfacing application all require specialised equipment. Hiring a vetted local partner protects the investment from the start.

Will the site need grading before the court goes in?

Most sites need at least some grading to achieve the 1-percent slope required for surface drainage. Steeper or uneven lots require cut-and-fill earthwork before the base goes down. The on-site evaluation identifies the grading scope, and the written estimate breaks out that cost separately so there are no surprises.

How do you handle drainage for a tennis court?

The court surface is built to a precise 1-percent cross-slope so water sheets off rather than pooling. On sites with poor soil permeability or high water tables, perimeter French drains or channel drains are added beneath or around the slab. Drainage is assessed during the initial site evaluation before any base work begins.

More questions about Tennis Court Installation?

Start with a Free On-Site Evaluation

Share your site and what you want to play. We’ll arrange a visit, assess the soil and drainage, and put a written estimate together covering every line item.

Request an Evaluation