Inadequate Drainage
A court without a verified slope traps water after Orlando’s afternoon rain, softening the base and accelerating surface cracking.
Slope Verified Before Pour
Drainage slope and outlet placement are confirmed on site before the concrete or asphalt base is poured, not added as an afterthought.